Changes in A901 1.11 (rel. to 1.10) ================================== + The user has the ability to run the baseline building model in only one direction. + The baseline building models simulation can now run with time-split parallelization. + The pressure drop adjustments for heat recovery, runaround coil loop and evaporative cooling are only applied if the air-handling unit contains a heat recovery unit (checked automatically in the baseline building model). + Improvements in the zone table information. Total areas are now presented for conditioned, heated-only, semi-heated and unconditioned spaces. + The user can now visualize the "Belong to floor/group" parameter in the 3D-view. + Two columns added in the AHU table showing the system type and the served area. + Manuals are updated. Fixed bugs ---------- + Fixed the central heating/cooling system when purchased chilled water is used. + Fixed mapping of "BB airflow through device" + Fixed a bug in system 5. + Fixed a minor bug in system 8. + Update constructions of walls and roofs that are connected to ground correctly (came up after ICE 4.8). + Fixed systems 6 and 8 so that they are compatible with variable setpoints. + Other minor fixes.